  "schema": "careeron.evidence/1",
  "digest": "ev1_2ee46f12cfa85768",
  "generatedOn": "2026-11-14",
  "locale": "en",
  "article": {
    "id": "6985a046-c57d-46d8-b31d-eee855e2b862",
    "slug": "the-companies-a-power-system-cannot-run-without",
    "title": "The companies a power system cannot run without",
    "publishedOn": "2026-09-30",
    "lastReviewedOn": "2026-09-30",
    "factChecked": true
  },
  "counts": {
    "citations": 8,
    "citationsLinked": 8,
    "citationsAttested": 0,
    "citationsProbed": 8,
    "citationsReachable": 8,
    "figures": 0,
    "corrections": 0
  },
  "citations": [
    {
      "ref": "S1",
      "publisher": "Commission de régulation de l’énergie (CRE)",
      "title": "Délibération n°2025-77 du 13 mars 2025, TURPE 7 HTB",
      "url": "https://cre.fr/fileadmin/Documents/Deliberations/2025/250313_2025-77_Post-CSE_TURPE_7_HTB.pdf",
      "publishedOn": "2025-03-13",
      "datePrecision": "day",
      "supports": "le gestionnaire du réseau public de transport issu de la séparation juridique imposée à Electricité de France par l'article L. 111-57 ... l’usage des flexibilités au niveau national par RTE dans le cadre de la gestion de l’équilibre offre-demande est déjà largement répandu et très largement ouvert aux nouvelles capacités de flexibilité",
      "identity": null,
      "reachability": {
        "verdict": "live",
        "probedOn": "2026-11-04",
        "statusCode": 206
      },
      "corrections": []
    },
    {
      "ref": "S2",
      "publisher": "Commission de régulation de l’énergie (CRE)",
      "title": "Délibération n°2025-78 du 13 mars 2025, TURPE 7 HTA-BT",
      "url": "https://cre.fr/fileadmin/Documents/Deliberations/2025/250313_2025-78_Post-CSE_TURPE_7_HTA-BT.pdf",
      "publishedOn": "2025-03-13",
      "datePrecision": "day",
      "supports": "les provisions pour renouvellement constituées par Enedis pour assurer le renouvellement des ouvrages en concession ... Les écarts entre les coûts supportés par les entreprises locales de distribution (ELD) et leurs recettes résultant de l’application du TURPE à leurs clients sont compensés par le Fonds de péréquation de l’électricité (FPE)",
      "identity": null,
      "reachability": {
        "verdict": "live",
        "probedOn": "2026-11-04",
        "statusCode": 206
      },
      "corrections": []
    },
    {
      "ref": "S3",
      "publisher": "International Energy Agency",
      "title": "Building the Future Transmission Grid: Strategies to navigate supply chain challenges",
      "url": "https://iea.blob.core.windows.net/assets/a688d0f5-a100-447f-91a1-50b7b0d8eaa1/BuildingtheFutureTransmissionGrid.pdf",
      "publishedOn": "2025-02-25",
      "datePrecision": "day",
      "supports": "Average lead times for cables and large power transformers have almost doubled since 2021. ... Lead times for cables have increased significantly, now extending up to two or three years depending on the complexity of the project, compared to just one or two years a few years ago. ... Top ten cable manufacturers account for around 50% of the global market.",
      "identity": {
        "legalName": "International Energy Agency",
        "jurisdiction": "INTL",
        "register": null,
        "registerId": null,
        "registerUrl": null,
        "attestedOn": null,
        "attested": false
      },
      "reachability": {
        "verdict": "live",
        "probedOn": "2026-11-04",
        "statusCode": 206
      },
      "corrections": []
    },
    {
      "ref": "S4",
      "publisher": "Autorité de sûreté nucléaire et de radioprotection",
      "title": "ASN Report on the state of nuclear safety and radiation protection in France in 2024",
      "url": "https://regulation-oversight.asnr.fr/content/download/204901/file/ASN-Report-on-the-State-of-nuclear-safety-and-radiation-protection-in-France-in-2024.pdf",
      "publishedOn": "2025-05-22",
      "datePrecision": "day",
      "supports": "It stipulates that responsibility for the safety of nuclear activities entailing risks lies with those who undertake or perform them. ... in coordination with EDF, the licensee of the NPPs. ... In December 2024, the average age of the 56 reactors in operation (excluding the EPR reactor)",
      "identity": {
        "legalName": null,
        "jurisdiction": null,
        "register": null,
        "registerId": null,
        "registerUrl": null,
        "attestedOn": null,
        "attested": false
      },
      "reachability": {
        "verdict": "live",
        "probedOn": "2026-11-04",
        "statusCode": 206
      },
      "corrections": []
    },
    {
      "ref": "S5",
      "publisher": "Enedis",
      "title": "Appel d’Offres Flexibilités Locales 2025 S1 RFQ-2501, Résultats (V1)",
      "url": "https://enedis.fr/media/4626/download",
      "publishedOn": "2025-06-02",
      "datePrecision": "day",
      "supports": "au premier semestre 2025, l’appel d’offres pour des services de flexibilités locales a concerné 58 zones d’opportunités ... Lot n°1 - Chamonix DR Alpes Hausse 0",
      "identity": null,
      "reachability": {
        "verdict": "live",
        "probedOn": "2026-11-04",
        "statusCode": 206
      },
      "corrections": []
    },
    {
      "ref": "S6",
      "publisher": "Enedis",
      "title": "Appel d’Offres Flexibilités Locales 2025 S2 RFQ-2502 à RFQ-2505, Résultats (V1)",
      "url": "https://enedis.fr/media/5006/download",
      "publishedOn": "2026-01-16",
      "datePrecision": "day",
      "supports": "Les appels d’offre 2025 S2 ont concernés un total de 8 zones d’opportunité. ... En l’absence d’offres reçues, les lots RFQ-2502 Villefranche 2, RFQ-2503 Bourbon l’Archambault 1, RFQ-2503 Bourbon l’Archambault 2, RFQ-2504 Auzances 2 ont fait l’objet d’une prolongation jusqu’au 02/01/2026.",
      "identity": null,
      "reachability": {
        "verdict": "live",
        "probedOn": "2026-11-04",
        "statusCode": 206
      },
      "corrections": []
    },
    {
      "ref": "S7",
      "publisher": "FEDENE Réseaux de chaleur et de froid (SNCU)",
      "title": "Enquête des réseaux de chaleur et froid, édition 2024 (données 2023)",
      "url": "https://fedene.fr/wp-content/uploads/2024/11/241119_Rapport-2024-vf.pdf",
      "publishedOn": "2024-11-01",
      "datePrecision": "month",
      "supports": "Les collectivités territoriales décident librement de : ... Gérer directement le service ; ou ... Conﬁer la gestion du service à un tiers par le biais d'une concession ou délégation de service public. ... GLOBAL France 1 000 7 515 50 065 26 428",
      "identity": null,
      "reachability": {
        "verdict": "live",
        "probedOn": "2026-11-04",
        "statusCode": 206
      },
      "corrections": []
    },
    {
      "ref": "S8",
      "publisher": "Commission de régulation de l’énergie (CRE)",
      "title": "Délibération n°2021-121 du 10 juin 2021, orientations sur la concurrence sur les territoires des ELD",
      "url": "https://cre.fr/fileadmin/Documents/Actualites/import/210610_2021-121_Concurrence_ELD.pdf",
      "publishedOn": "2021-06-10",
      "datePrecision": "day",
      "supports": "Sur le réseau de distribution en France métropolitaine, environ 95% des consommateurs finals d’électricité sont desservis par Enedis ... Les quelque 5 % restants sont raccordés à des réseaux exploités par plus d’une centaine d’entreprises locales de distribution (ELD)",
      "identity": null,
      "reachability": {
        "verdict": "live",
        "probedOn": "2026-11-04",
        "statusCode": 206
      },
      "corrections": []
    }
  ],
  "figures": [],
  "boundaries": [
    "This manifest lists the structured evidence held for this article. It is not a claim that every sentence carries a citation.",
    "Reachability is the verdict of our last automated probe of each link. Where no probe proved a verdict, the manifest says so rather than assuming the document is live.",
    "Corrections are limited to changes filed after publication through the editorial desk. Changes made before this record existed are not covered.",
    "No individual is named. Who edited, reviewed or probed a source is recorded internally and is not part of this export.",
    "The digest fingerprints the evidence, not the export date. Two exports of unchanged evidence carry the same digest."
  ]
}