What Europe asks in return for chip aid: eight decisions, side by side

Between October 2022 and November 2025 the Commission cleared aid for eight first-of-a-kind chip plants. Every release binds the plant to crisis orders and profit sharing; the rest of the promises diverge, and none prints a job count.

Key figureST’s Catania Campus pairs a commitment to 200 mm silicon carbide with a pledge to develop and deploy training to expand the skilled workforce. [4] Source 4

Evidence reviewed · November 19, 2026 · 21 sources

The briefing, spoken

0:00-8:26
Voice: Sophie

On 28 April 2023, the European Commission cleared French support for a new chip plant at Crolles, near Grenoble, to be built and run by STMicroelectronics and GlobalFoundries. The release put the companies' investment at €7.4 billion. It then listed what the two companies had agreed to do in return: serve the Union's "priority rated orders" in a shortage, keep developing the next generation of FD-SOI chips, and "make available some capacity for small and medium enterprises ('SMEs') and third parties to test and develop their products in a real industrial production environment" (European Commission, 28 April 2023).

When Europe pays for a chip plant, what does it ask for in return, and what do those promises mean for the people who will work there? This piece reads every Commission release we could open on aid for a first-of-its-kind chip facility, from October 2022 to November 2025, and sets their conditions side by side.

Every one of the eight releases carries the same two clauses: the plant will accept crisis orders, and it will share with the state any profit above expectations. Beyond those two, the conditions diverge. Some plants open their lines to outsiders, some promise training, some promise the next technology generation. None of the eight releases prints a number of jobs. For a candidate, the differences in the conditions are a better guide to the work than the size of the cheque.

This is CareerOn's first piece read from the Commission's side of the table. Our earlier dossier on the Crolles capital record reads that one plant's aid and investment figures against each other; this one reads the conditions across Europe. It rests on twelve dated documents, each opened first-hand. The commitments are quoted as the Commission's releases print them. The grant agreements themselves are not public, and we do not guess at what they add.

One clause in every decision

The common clause comes from the European Chips Act, the regulation adopted in September 2023. Its Article 26 lets the Commission, once a crisis stage is activated, "require integrated production facilities and open EU foundries to accept and prioritise an order of crisis-relevant products (priority-rated order)". The same article says that obligation "shall take precedence over any performance obligation under private or public law" (Regulation (EU) 2023/1781, Article 26(1)).

A second paragraph extends the reach. The obligation "can be imposed to other semiconductor undertakings which have accepted such possibility in the context of receiving public support" (Regulation (EU) 2023/1781, Article 26(2)). That is the bridge between aid and crisis powers: a company that accepts public money can accept, in the same act, that its order book may be reordered by Brussels in a shortage.

The clause predates the regulation. In October 2022, eleven months before the Act was adopted, the Commission cleared a €292.5 million Italian grant for STMicroelectronics' €730 million substrate plant in Catania. The company undertook to "satisfy EU priority rated orders in the case of a supply shortage" (European Commission, 5 October 2022). Every release since has carried a version of the same promise.

For a reader, that clause matters less as law than as a description of the plant. A facility that may have to switch its production to crisis-relevant products is a facility whose planning, quality and supply-chain teams are built to change course. It is the one condition every plant in this set shares.

Eight decisions, six kinds of promise

The table below sets out what each release prints. "Printed" means the release states the commitment; "not printed" means it does not, which is not proof that the agreement omits it. We left out a seventh column, the promise to apply for a status under the Chips Act, and treat it in the next section.

What each plant promised, as the Commission's release prints it

Plant (release date)Crisis ordersNext generationOpen to outsidersTrainingProfit share
ST Catania substrates (5 Oct 2022)PrintedPrintedNot printedNot printedPrinted
ST and GF Crolles (28 Apr 2023)PrintedPrinted: FD-SOIPrinted: SMEs and third partiesExpected effect onlyPrinted
ST Catania Campus (31 May 2024)PrintedPrinted: 200 mm SiCNot printedPrintedPrinted
ESMC Dresden (20 Aug 2024)PrintedPrintedPrinted: SMEs and universitiesPrinted: talent pipelinePrinted
Silicon Box Novara (18 Dec 2024)PrintedPrinted: advanced packagingNot printedPrintedPrinted
Infineon Dresden (20 Feb 2025)PrintedPrintedPrinted: SMEs and research bodiesNot printedPrinted
ams Osram Premstätten (24 Feb 2025)PrintedNot printedPrinted: partially openPrintedPrinted
onsemi Rožnov (21 Nov 2025)PrintedPrinted: 200 mm SiCNot printedPrintedPrinted

Sources 2 European Commission · 3 European Commission · 4 European Commission · 5 European Commission · 6 European Commission · 7 European Commission · 8 European Commission · 9 European Commission

Two columns are full. Crisis orders appear in all eight. So does profit sharing: at Crolles, ST and GF "have agreed to share potential additional profits beyond current expectations with France" (European Commission, 28 April 2023). The 2024 Catania release adds a clause no other release in this set carries: the project "will not be subject to the extraterritorial application of public service obligations imposed by a third country" (European Commission, 31 May 2024). Read plainly, a plant paid for by Italy should not be steered by another country's rules.

The training column changed over time. The 2022 Catania release prints no training undertaking. From May 2024, four releases print a near-identical sentence: the company will "develop and deploy educational and skills training to increase the pool of qualified and skilled workforce" (European Commission, 31 May 2024). Silicon Box, ams Osram and onsemi carry the same wording. Crolles, in April 2023, says only that the project "will support the development of EU highly skilled workforce" (European Commission, 28 April 2023): an expected effect, not an undertaking.

We do not score the plants. A release that prints fewer commitments may reflect a different plant, a different market or simply a shorter text. What the table supports is narrower: the obligations a candidate can read in public differ from plant to plant, and they can be checked.

Who must open the door

The Chips Act creates two statuses for first-of-a-kind plants. An "integrated production facility" makes chips for its own designs. An "open EU foundry" is a first-of-a-kind facility "that offer production capacity to unrelated undertakings" (Regulation (EU) 2023/1781, Article 14(1)). Both rest on a single definition: a facility that "provides innovation with regard to the manufacturing process or final product that is not yet substantively present or committed to be built within the Union" (Article 2(11)).

Four releases print some form of access for outsiders, and they describe it differently. ESMC, the Dresden joint venture of TSMC, Bosch, Infineon and NXP, goes furthest: "any customer" can place orders, with "special access to its production capacities for SMEs and European universities", and the company undertook to "apply to be recognised as an Open EU Foundry" (European Commission, 20 August 2024).

Infineon in Dresden will "provide access to its new facility to SMEs and research organisations for testing and prototyping", and will apply to be recognised as an integrated production facility (European Commission, 20 February 2025). The ams Osram plant at Premstätten in Austria will be "partially open to other semiconductor companies to design and produce their own semiconductor chips" (European Commission, 24 February 2025). Crolles, as quoted above, offers test and development capacity to SMEs and third parties.

Two cautions apply. First, applying for a status is not holding it; the Catania release states that recognition "is independent from the State aid assessment" (European Commission, 31 May 2024). Second, Silicon Box also undertook to apply for open-foundry status (European Commission, 18 December 2024), yet its release prints no SME or third-party access clause of the Crolles kind. The status and the access promise are separate lines, and we keep them separate.

For a career, opening the door has a practical meaning. A plant that serves outside customers or hosts prototypes needs people who face customers: application engineers, test engineers, process engineers who can run someone else's design, and the staff who manage the scheduling of shared capacity. The releases do not name those jobs. They describe the arrangement that makes them necessary.

Money and promises are not on the same scale

The chart shows the aid each release prints, in millions of euros. For Crolles, the April 2023 release prints only the €7.4 billion investment; the aid figure comes from a later release, which recalls a "€2.9 billion French aid measure" approved on 27 April 2023. We print both dates as their documents print them.

Aid printed in each Commission release

ESMC Dresden (2024)€5bnST and GF Crolles (2023)€2.9bnST Catania Campus (2024), approximately€2bnSilicon Box Novara (2024), approximately€1.3bnInfineon Dresden (2025), up to€920monsemi Rožnov (2025), approximately€450mST Catania substrates (2022)€292.5mams Osram Premstätten (2025), approximately€227m
  • ESMC Dresden (2024): €5bn € million, as printed ("approximately" and "up to" kept in the label)
  • ST and GF Crolles (2023): €2.9bn € million, as printed ("approximately" and "up to" kept in the label)
  • ST Catania Campus (2024), approximately: €2bn € million, as printed ("approximately" and "up to" kept in the label)
  • Silicon Box Novara (2024), approximately: €1.3bn € million, as printed ("approximately" and "up to" kept in the label)
  • Infineon Dresden (2025), up to: €920m € million, as printed ("approximately" and "up to" kept in the label)
  • onsemi Rožnov (2025), approximately: €450m € million, as printed ("approximately" and "up to" kept in the label)
  • ST Catania substrates (2022): €292.5m € million, as printed ("approximately" and "up to" kept in the label)
  • ams Osram Premstätten (2025), approximately: €227m € million, as printed ("approximately" and "up to" kept in the label)

€ million, as printed ("approximately" and "up to" kept in the label)

Sources 2 European Commission · 4 European Commission · 5 European Commission · 6 European Commission · 7 European Commission · 8 European Commission · 9 European Commission

Where a release prints both the aid and the investment, the pair is worth reading together. Catania Campus: about €2 billion4 of aid for an investment of €5 billion4 (European Commission, 31 May 2024). Silicon Box: about €1.3 billion6 for €3.2 billion6 (European Commission, 18 December 2024). Infineon: up to €920 million for €3.5 billion (European Commission, 20 February 2025). onsemi: about €450 million for €1.64 billion (European Commission, 21 November 2025). The ESMC release prints the aid but not the investment. We print no ratio the releases do not print.

The most telling cell in this chart is one it cannot show. None of the eight releases prints a number of jobs. The Commission's release on an €81 million12 grant to Diamond Foundry Europe in Spain, assessed under the regional-aid rules rather than as a first-of-a-kind chip plant, does: "approximately 300 direct jobs" (European Commission, 16 December 2024). The chip releases speak of workforce in terms of skills and training. They do not commit to a headcount, and a reader should not assume one.

Approval is not a factory

A decision clears aid; it does not build a plant. In July 2025, Intel told investors that it "will no longer move forward with planned projects in Germany and Poland" (Intel, 24 July 2025). The German project had been among the largest planned in Europe. We found no Commission release clearing aid for it, and we do not list it in the table.

Crolles has a story of its own, which our capital-record dossier reads in detail. For this piece we hold to one rule: we found no primary statement from ST or GlobalFoundries in 2025 or 2026 on the project's current status, so we report none. The conditions above describe what was promised in 2023. Whether each plant delivers them will show in the years ahead, and the releases themselves do not describe how delivery is checked.

Aid cleared, and one plan withdrawn

  1. 5 Oct 2022

    ST Catania substrates cleared (Italy)

  2. 28 Apr 2023

    ST and GF Crolles cleared (France)

    A later release dates the approval 27 April 2023

  3. Sep 2023

    European Chips Act adopted and published

  4. 31 May 2024

    ST Catania Campus cleared (Italy)

  5. 20 Aug 2024

    ESMC Dresden cleared (Germany)

  6. 18 Dec 2024

    Silicon Box Novara cleared (Italy)

  7. 20 Feb 2025

    Infineon Dresden cleared (Germany)

  8. 24 Feb 2025

    ams Osram Premstätten cleared (Austria)

  9. 24 Jul 2025

    Intel stops its planned German and Polish projects

  10. 21 Nov 2025

    onsemi Rožnov cleared (Czechia)

Sources 2 European Commission · 3 European Commission · 4 European Commission · 5 European Commission · 6 European Commission · 7 European Commission · 8 European Commission · 9 European Commission · 11 Intel Corporation

The auditors' view of the whole

The European Court of Auditors reviewed the strategy in 2025. It found that the Commission "has already made reasonable progress in implementing its strategy", but also "weaknesses in its preparation, implementation and monitoring". On the headline goal, a 20%10 EU share of the global chip value chain by 2030, it judged the strategy "very unlikely to be sufficient", and reported that "it is currently predicted that its share will be only 11.7 %10 by 2030" (European Court of Auditors, Special report 12/2025, paragraph 07).

That finding does not make any single plant less real. It says that the aid decisions, taken together, are not expected to reach the target set for them. For a candidate, the useful reading is closer to the ground: the plants that were cleared are specific, the conditions attached to them are public, and the work they describe is concrete.

What it means for your career

For candidates, read the conditions as a job map. A commitment to serve outside customers or host prototypes, as at Crolles, ESMC and Infineon, points to customer-facing engineering, test and prototyping roles. A commitment to the next technology generation, such as FD-SOI at Crolles or 200 mm silicon carbide at Catania and Rožnov, points to process-development work. A training commitment points to programmes a newcomer can enter. None of this is a vacancy; it is where to look.

For employers, especially smaller firms, the access clauses are an opening. Several plants have undertaken to give SMEs or research bodies room to test and develop products. The priority-order clause is the other side of that bargain: a supplier to a plant that may be asked to reorder its production in a shortage should expect its own schedules to move.

For decision-makers, the record supports two requests. Publish the commitments in a form that can be compared, as this table tries to do from the releases. And publish how delivery is checked: the auditors found weaknesses in monitoring, and the releases do not say how a training or access promise will be verified.

CareerOn's view is that a chip plant's conditions tell a job-seeker more than its subsidy. Access clauses mean customer-facing engineering, generation clauses mean process development, and training clauses mean ways in. We have not placed a CareerOn practice exercise that matches these roles in this piece, so none is offered here; we record that as a gap in our catalogue.

The cheque is the number that makes the news. The conditions are the part that lasts, and they are written down in public, one release at a time.