Coverage register
Grenoble Métropole
4 of 4 declared anchors in Grenoble Métropole carry current published coverage, across 15 counted dossiers; 0 are declared and not yet documented. Counted in the database, not claimed.
No anchor in this territory is past its published date.
- 4
- Anchors declared
- 4
- Documented
- 15
- Dossiers counted
- 0
- Past our own date
Why this ring exists
The densest research-to-fab corridor in Europe: Minatec, the Presqu’île campus and the Y-shaped valley that carries them. Our home ring — coverage here is a matter of standing, not of ambition.
- Documented · 4
Declared in this territory
- Documented
Research infrastructure
CEA-Leti
Minatec campus, Grenoble
3 published dossiers, the newest dated 2026-03-09 — inside our 540-day currency window. 7 further dossiers mention it in passing; we do not count a mention as coverage.
Almost every semiconductor job in the valley traces back to a Leti pilot line. Readers need to understand how a research institute converts public programmes into industrial hiring, and what a Leti-to-industry path actually looks like.
Published on this anchor
Coverage stands today, and we re-establish this anchor by 2026-12-15.
- Documented
Electrification & software
Schneider Electric
IntenCity & Technopole, Grenoble
4 published dossiers, the newest dated 2026-09-02 — inside our 540-day currency window. 4 further dossiers mention it in passing; we do not count a mention as coverage.
Schneider turns electrification into software, and hires as much for data and cybersecurity as for power engineering. Readers need the competency mix behind that shift, not the brand.
Published on this anchor
Coverage stands today, and we re-establish this anchor by 2026-10-31.
- Documented
Semiconductors
STMicroelectronics
Crolles 300 mm fab
6 published dossiers, the newest dated 2026-09-02 — inside our 540-day currency window. 5 further dossiers mention it in passing; we do not count a mention as coverage.
Crolles is where European FD-SOI is actually manufactured, and the largest single engineering employer in the valley. A reader deciding on a process, equipment or test career needs the ramp, the skills it hires and the constraints it works under.
Published on this anchor
Coverage stands today, and we re-establish this anchor by 2026-11-30.
- Documented
Batteries
Verkor
Grenoble headquarters & innovation centre
2 published dossiers, the newest dated 2026-09-02 — inside our 540-day currency window. 4 further dossiers mention it in passing; we do not count a mention as coverage.
A battery scale-up headquartered in Grenoble and building in Dunkirk is the clearest live case of regional R&D feeding a national industrial site — including the risk profile a candidate takes on.
Published on this anchor
Coverage stands today, and we re-establish this anchor by 2026-09-30.
How this page is counted
Each anchor is an employer at a named site, written down in advance with the search terms that identify it. A database function counts published dossiers matching those terms, over title, standfirst and body, and returns the newest date. An anchor reads as documented only when its newest dossier is inside our 540-day currency window. If the count fails, every anchor reads as not measured — never as covered.
All territories