Coverage register
Grenoble Métropole
8 of 8 declared anchors in Grenoble Métropole carry current published coverage, across 54 counted dossiers; 0 are declared and not yet documented. Counted in the database, not claimed.
No anchor in this territory is past its published date.
- 8
- Anchors declared
- 8
- Documented
- 54
- Dossiers counted
- 0
- Past our own date
Why this ring exists
The densest research-to-fab corridor in Europe: Minatec, the Presqu’île campus and the Y-shaped valley that carries them. Our home ring: coverage here is a matter of standing, not of ambition.
- Documented · 8
Capital declared here
Open the capital register€5.8bn of confirmed capital is declared across 6 events in Grenoble Métropole, reaching 3 declared anchors. A further €650m is reported and not confirmed, counted apart.
- €5.8bn
- Confirmed
- €650m
- Reported, not confirmed
- 6
- Declared events
Debt facility
Verkor
€1.3bn
ConfirmedGreen loan from nineteen banking entities, allocated to the first gigafactory at an initial 16 GWh per year.
Established 2024-05-24 · 1 dated citations
Equity round
Aledia
€120m
ConfirmedRound raised from existing shareholders and the French state through France 2030, to industrialise microLED at Champagnier.
Established 2023-09-23 · 2 dated citations
Equity round
Verkor
€850m
ConfirmedSeries C capital signed to launch the Dunkirk gigafactory and the Grenoble innovation centre.
Established 2023-09-14 · 2 dated citations
State aid
Verkor
€650m
Reported, not confirmedFrench subsidies quoted at around this level in the financing release, subject to final European Commission approval.
Established 2023-09-14 · 1 dated citations
2 further declared events sit in the capital register.
Money committed to a site is not coverage of it: an anchor can appear here and still be undocumented above.
Declared in this territory
- Documented
Research infrastructure
CEA-Leti
Minatec campus, Grenoble
14 published dossiers, the newest dated 2026-10-02: inside our 540-day currency window. 10 further dossiers mention it in passing; we do not count a mention as coverage.
Almost every semiconductor job in the valley traces back to a Leti pilot line. Readers need to understand how a research institute converts public programmes into industrial hiring, and what a Leti-to-industry path actually looks like.
Published on this anchor
Coverage stands today, and we re-establish this anchor by 2026-12-15.
- Documented
Electrification & software
Schneider Electric
IntenCity & Technopole, Grenoble
6 published dossiers, the newest dated 2026-09-29: inside our 540-day currency window. 5 further dossiers mention it in passing; we do not count a mention as coverage.
Schneider turns electrification into software, and hires as much for data and cybersecurity as for power engineering. Readers need the competency mix behind that shift, not the brand.
Published on this anchor
Coverage stands today, and we re-establish this anchor by 2026-10-31.
- Documented
Semiconductors
STMicroelectronics
Crolles 300 mm fab
20 published dossiers, the newest dated 2026-09-29: inside our 540-day currency window. 8 further dossiers mention it in passing; we do not count a mention as coverage.
Crolles is where European FD-SOI is actually manufactured, and the largest single engineering employer in the valley. A reader deciding on a process, equipment or test career needs the ramp, the skills it hires and the constraints it works under.
Published on this anchor
- Every chip job, and how to rehearse it2026-09-29
- The arguments inside the chip industry2026-09-29
- What Europe’s fabs are building in 20262026-09-29
Coverage stands today, and we re-establish this anchor by 2026-11-30.
- Documented
Batteries
Verkor
Grenoble headquarters & innovation centre
5 published dossiers, the newest dated 2026-09-06: inside our 540-day currency window. 6 further dossiers mention it in passing; we do not count a mention as coverage.
A battery scale-up headquartered in Grenoble and building in Dunkirk is the clearest live case of regional R&D feeding a national industrial site: including the risk profile a candidate takes on.
Published on this anchor
Coverage stands today, and we re-establish this anchor by 2026-09-30.
- Documented
Semiconductors
Aledia
Champagnier microLED fab, Grenoble Métropole
3 published dossiers, the newest dated 2026-09-04: inside our 540-day currency window.
A venture-funded display start-up built a 300 mm fab in the metropole, which is rare enough to be evidence rather than an example. Readers need the truth about scale-up hiring: which epitaxy, process and yield skills survive a ramp and which do not.
Published on this anchor
- Hiring and cutting at once: what the Crolles record says about semiconductor skills in Isère2026-09-04
- The 300 mm decision de-risks the engineer: which microLED skills transfer around Grenoble2026-09-04
- Fifteen years to a product: reading Aledia’s Champagnier fab against its own contradictions2026-09-04
Coverage stands today, and we re-establish this anchor by 2026-11-15.
- Documented
Photonics & imaging sensors
Teledyne e2v
Grenoble imaging-sensor site
2 published dossiers, the newest dated 2026-09-03: inside our 540-day currency window.
Image sensors designed in Grenoble fly on scientific instruments and run machine-vision lines worldwide, under American ownership of a French design team. Readers need to see how sensor design, radiation hardness and export rules shape that career.
Published on this anchor
Coverage stands today, and we re-establish this anchor by 2027-01-15.
- Documented
Simulation & training
Corys
Grenoble simulation headquarters
2 published dossiers, the newest dated 2026-09-04: inside our 540-day currency window. 1 further dossier mentions it in passing; we do not count a mention as coverage.
Operator training for nuclear plants, rail networks and process industry is engineered in Grenoble, and it is one of the few software careers here that is regulated end to end. Readers need the modelling and validation skills that work buys.
Published on this anchor
Coverage stands today, and we re-establish this anchor by 2027-03-31.
- Documented
Hydrogen
Inocel
Grenoble headquarters & Belfort assembly
2 published dossiers, the newest dated 2026-09-04: inside our 540-day currency window. 1 further dossier mentions it in passing; we do not count a mention as coverage.
High-power fuel cells for heavy transport and data-centre backup are engineered from Grenoble and assembled in Belfort, a split that decides where the jobs land. Readers need the difference between hydrogen announcements and a funded production plan.
Published on this anchor
Coverage stands today, and we re-establish this anchor by 2027-02-28.
How this page is counted
Each anchor is an employer at a named site, written down in advance with the search terms that identify it. A database function counts published dossiers matching those terms, over title, standfirst and body, and returns the newest date. An anchor reads as documented only when its newest dossier is inside our 540-day currency window. If the count fails, every anchor reads as not measured: never as covered.
All territories